Andijan-PharmFree Economic Zone · Uzbekistan
Contact
Aerial masterplan of the Andijan-Pharm Free Economic Zone

Pharmaceutical Free Economic Zone — Andijan, Uzbekistan

A pharmaceutical zone, engineered for production.

52.7 hectares minutes from Andijan — with tax holidays, duty-free imports and government-built utilities. The gateway for pharma manufacturers into Uzbekistan.

Scroll
52.7 haTotal zone area
3–10 yrsProperty & land tax holiday
$29k/haLand via e-auction
$117.5MInvestment landed to date

Why Andijan-Pharm

Pharma-first, and built for the companies that actually make things.

Established by Presidential Decree PF-5629 in 2019, Andijan-Pharm is a dedicated pharmaceutical free economic zone — created to attract high-tech drug manufacturing and the deep processing of local medicinal-plant raw materials into finished medicines.

It is pharma-first but processing-friendly: producers in food and agro-processing already operate alongside pharma tenants, sharing the same incentives, utilities and logistics.

High-tech pharmaMedicinal-plant processing Food & agro-processingExport-oriented

Incentives

The zone carries the cost that usually slows you down.

Resident companies receive a package of tax, customs and infrastructure benefits scaled to their investment.

01

Tax holiday, 3–10 years

Exemption from property tax and land tax, with the term scaled to the size of the investment.

02

Duty-free imports

No customs duty on technological equipment, construction materials and production inputs (clearance fees apply).

03

VAT deferred 120 days

Import VAT on goods brought into the zone is deferred for up to 120 days.

04

Utilities by government

Electricity, gas, water and roads are delivered to the plot by the state — not at your cost.

05

Land from $29k/ha

Plots are allocated through a transparent electronic e-auction at roughly $29,000–34,000 per hectare.

06

FEZ legal status

A stable regime under Presidential Decree PF-5629 (2019), with an established residency procedure.

Land

52.7 hectares, and parcels still available right now.

Of the total area, 43 ha is set aside for investment projects and 9.7 ha for shared infrastructure. Six lots remain open for new residents.

Investment plots43 ha

Infrastructure9.7 ha

Available now — 6 lots9.65 ha

Output benchmark ≈ 2.88 bln soum per hectare

Illustrative masterplan Masterplan parcels of the Andijan-Pharm zone

Momentum

Investors are already building here.

23projects landed · $117.55M committed · 1,625 jobs planned
$78.6M2026–2028 pipeline · 14 projects · ~1,090 new jobs
9.65 hastill available across 6 lots — actively courting foreign investors

Contact

Tell us what you make. We'll send the parcel and incentives pack.

Direct lines to the zone directorate and the international cooperation desk — including a dedicated China desk.

International cooperationAzizillo Iminov+998 33 909 08 88
China deskSultonmurod Toshpulatov+998 50 703 09 51
General enquiriesZone directorate+998 74 223 24 20